Difference between revisions of "Boot Sequence"

From meteobridge
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
<translate>
 
 
<!--T:1-->
 
<!--T:1-->
 
<br />On power-on Meteobridge device runs through a couple of different phases where you can interact by pressing the button on top of the unit (TL-MR3020 or TL-WR703N) or at the back behind a pin hole (WL-330N3G). Picture below tries to illustrate what these phases are, how to recognize them and what options you have being there.
 
<br />On power-on Meteobridge device runs through a couple of different phases where you can interact by pressing the button on top of the unit (TL-MR3020 or TL-WR703N) or at the back behind a pin hole (WL-330N3G). Picture below tries to illustrate what these phases are, how to recognize them and what options you have being there.

Latest revision as of 15:05, 17 January 2021


On power-on Meteobridge device runs through a couple of different phases where you can interact by pressing the button on top of the unit (TL-MR3020 or TL-WR703N) or at the back behind a pin hole (WL-330N3G). Picture below tries to illustrate what these phases are, how to recognize them and what options you have being there.

Operational-flow-chart.png

</translate>